Shane

Shane

Dublin Tunnel Toll Plaza Upgrade

Carra are delighted to have been chosen by Indra Sistemas as the install partner for the Dublin Tunnel Toll Plaza Upgrade. The new hybrid tolling solution uses state of the art technology and will be installed by Q4 2024. Having…

Re-charge at Dun Laoghaire Harbour!

Carra installed an ABL dual charge unit, sponsored by Volvo Ireland. Just over a year in the ground and the ABL unit has had over 1650 charge cycles! We specialise in the installation of electric vehicle chargers for public use.  Please…

Intel supports the switch to low carbon vehicles!

Carra have installed a suite of 24x electric car chargers at Intel’s Leixlip facility, which employees can access using an RFID card.  We developed a smart charging solution operated using Carra’s ParknRecharge software that has been specifically with business users…

Motorist Behaviour Monitoring System

Carra were commissioned by TII in 2020 to develop a roadside sensor platform capable of: A network of the delivered systems has been deployed at five sites along the M7. They are renewably powered and mounted upon existing structures. The…

Waterford City bottle-bin IoT Network

Carra were commissioned by Waterford City in 2020 to deploy a 20-sensor IoT network which could report the real-time status of Bottle Bins throughout the city. Carra deployed ultrasonic level-sensing devices and reported them to our WMW backend. The systems…