EV Points Installation Audi Limerick
Nice to have a bit of sunshine on our latest installation of 10 EV charge points at Audi…
Nice to have a bit of sunshine on our latest installation of 10 EV charge points at Audi…
The Carra team complete another successful BMW dealership at Morrisons in County Tipperary.Carra driving the electric future since…
Carra complete install of the new ABL EM4 chargers at Geodis logistics…..Carra driving the electric future since 2010!
Carra are delighted to have been chosen by Indra Sistemas as the install partner for the Dublin Tunnel…
Carra install a 175 kW Delta unit, a project which included a new sub station, with multiple AC units…
Carra installed an ABL dual charge unit, sponsored by Volvo Ireland. Just over a year in the ground…
Carra have installed a suite of 24x electric car chargers at Intel’s Leixlip facility, which employees can access…
Carra have installed an EV charger unit for Diageo at their iconic St. James Gate facility. It is an…
Carra were commissioned by TII in 2020 to develop a roadside sensor platform capable of: A network of…
Carra were commissioned by Waterford City in 2020 to deploy a 20-sensor IoT network which could report the…
Carra were commissioned by Blanchardstown Shopping Centre in 2019 to deploy an ANPR system across their campus which…
Carra Ireland installs chargers at Frank Keane Volkswagen This week Carra Ireland Limited has installed Rapid DC &…